Docs / Guides

ODN activation acceptance checklist (operator-agnostic)

Accept an ODN/PON activation when loss budgets, splitter records, wavelength plan, and ONT bring-up tests match the design — without claiming any operator partnership. This checklist is educational and project-agnostic.

Key facts

Activation acceptance checklist

  1. Design vs as-built splitter tree
  2. End-to-end loss at relevant wavelengths
  3. Connector/endface quality sample checks
  4. ONT authentication/provisioning success sample
  5. Alarm hygiene after soak period
  6. Handover pack: traces, power readings, serials

Decision table

FactorGuidance
Budget fail on dropRepair drop/connector before mass ONT ship
Coexistence filter missingStop XGS overlay until plan corrected
Serials uncapturedBlock acceptance until inventory complete

FAQ

Does this approve TRA/operator readiness?
No. Licensing/operator acceptance is separate and owned by licensed parties.
GPON or XGS-PON?
See XGS vs GPON selection factors on mother/engineering pages.
Optical budget deep dive?
Optical power budget checklist on Engineering Cloud.

Sources / method

IEEE/ITU optical classes + project design docs. No operator endorsements.

Related mother page:XGS-PON vs GPON selection factors.

Related docs

Document revision: 2026.07